ASTANA, December 28. /TASS/. The preliminary cost of the project for expansion of oil production at the Tengiz field (second stage) that would result in the recoverable amount of hydrocarbons increasing to 38 mln tonnes per year by 2021 is…
Sourced through Scoop.it from: tass.ru

Leave a comment